R195
|
1754.59 |
New Cons'n |
1997-02 |
|
South Troy Industrial Park Road Phase I (Southern End)
Improve existing East Industrial Parkway from Main Street/Burden Avenue (US 4) to northern terminus and construct a new two- lane road from there to Monroe Street, including sidewalks and bike lanes.
Project previously included R195A. R195 & R195A are capped in total. Any funding changes require at least Planning Committee action.
Before project split: R & D rolled-over. I was added by DOT. 0.742M was moved from C to R, and R was delayed one year. D rolled over. I, D & R are amounts obligated, with reductions moved to C.
|
Troy, City, 4000 feet |
|
STP-Flex |
3.316 |
|
|
.359 D |
2.500 C |
|
|
|
STP-Flex |
|
|
.057 I  |
.400 R |
|
|
|
|
Total |
3.316 |
  |
.057    |
.759    |
2.500    |
  |
  |
  |
Detailed Des |
0.359 |
  |
  |
.359    |
  |
  |
  |
  |
Construct'n |
2.500 |
  |
  |
  |
2.500    |
  |
  |
  |
ROW Incid. |
0.057 |
  |
.057    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.400 |
  |
  |
.400    |
  |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
May Require EIS
AQ Status: Non-Exempt
|
|
|
R195A
|
1761.30 |
New Cons'n |
1997-02 |
|
South Troy Industrial Park Road Phase II (Northern End)
Construct a new two-lane road from Monroe Street to Adams Street, including sidewalks, bike lanes a new bridge over the Poestenkill.
Project previously was included in R195. R195 & R195A are capped in total. Any funding changes require at least Planning Committee action.
|
Troy, City, 4000 feet |
|
STP-Flex |
6.801 |
|
|
|
.100 D |
5.761 C |
|
|
STP-Flex |
|
|
|
.435 R |
.465 R |
|
|
|
STP-Flex |
|
|
|
|
.040 I  |
|
|
|
Total |
6.801 |
  |
  |
.435    |
.605    |
5.761    |
  |
  |
Detailed Des |
0.100 |
  |
  |
  |
.100    |
  |
  |
  |
Construct'n |
5.761 |
  |
  |
  |
  |
5.761    |
  |
  |
ROW Aquis'n |
0.900 |
  |
  |
.435    |
.465    |
  |
  |
  |
ROW Incid. |
0.040 |
  |
  |
  |
.040    |
  |
  |
  |
|
Agency: City
Func. Class: UC
Plan Ref.: NV
May Require EIS
AQ Status: Non-Exempt
|
|
|
R246
|
1089.64 |
Bridge R/R |
2003-08 |
|
US 4 over the Hudson River: Element Specific Bridge Repair
BIN: 4000950
Related Project: SA205 from the 2003-08 TIP.
SA244 is the other half of this project.
|
Troy, State |
|
NHPP |
2.200 |
.200 D |
2.200 C |
|
|
|
|
|
Total |
2.200 |
.200    |
2.200    |
  |
  |
  |
  |
  |
Detailed Des |
  |
.200    |
  |
  |
  |
  |
  |
  |
Construct'n |
2.200 |
  |
2.200    |
  |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R257 |
1755.36 |
Bridge R/R |
2005-10 |
|
NY 151 (3rd Avenue) over East Street: Element Specific Bridge Repair
NY 43 was renamed NY 151 at this location.
|
Rensselaer, City |
|
STP-Urb. |
  |
4.019 C |
|
|
|
|
|
|
Total |
  |
4.019    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
4.019    |
  |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R277
|
1757.96 |
Bike/Ped |
2007-12 |
|
Lansingburgh Sidewalks
Pedestrian improvements along 116th St., 114th St., 113th St., and bicycle connections between 114th St. from Gurley Avenue to 2nd Ave.
As of 5/4/11 this project is not capped.
Funded via RG103 & was, changed to STP- Flex upon CMAQ termination.
|
Troy, City, 675 linear feet |
|
STP-Flex |
  |
|
|
|
|
|
|
.097 C |
STP-Flex |
|
|
|
|
|
|
|
.031 P |
Total |
  |
  |
  |
  |
  |
  |
  |
.128    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.097    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.031    |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R278
|
1757.98 |
Traff Op'n |
2007-12 |
|
126th Street/US 4 (2nd Avenue)
This was programmed as a top candidate for a roundabout. Final design depends on the project design process.
The roundabout includes streetscape improvements and crosswalks.
Funded via RG103 & was, changed to STP- Flex upon CMAQ termination.
|
Troy, City, NA |
|
STP-Flex |
  |
|
|
|
|
|
|
1.100 C |
STP-Flex |
|
|
|
|
|
|
|
.264 P |
STP-Flex |
|
|
|
|
|
|
|
.011 I  |
Total |
  |
  |
  |
  |
  |
  |
  |
1.375    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
1.100    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.264    |
ROW Incid. |
  |
  |
  |
  |
  |
  |
  |
.011    |
|
Agency: City
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R287
|
1758.15 |
Br.Replace |
2007-12 |
|
CR 68 (Snyder's Lake Road) Large Culvert and Bridge Over Wynantskill Creek
Bridge is replacement of BIN 3303610
Culvert to be Replaced with a Precast Box Culvert, Located between NY 150 and BIN 3303610. Culvert funded from RG138.
Now includes R312. NYSDOT moved funds from P to D.
|
Poestenkill, County |
|
STP-Urb. |
1.762 |
|
.002 I  |
.004 R |
1.511 C |
|
|
|
STP-Urb. |
|
|
.151 P |
.094 D |
|
|
|
|
Total |
1.762 |
  |
.153    |
.098    |
1.511    |
  |
  |
  |
ROW Incid. |
0.002 |
  |
.002    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.004 |
  |
  |
.004    |
  |
  |
  |
  |
Construct'n |
1.511 |
  |
  |
  |
1.511    |
  |
  |
  |
Prelim. Des. |
0.151 |
  |
.151    |
  |
  |
  |
  |
  |
Detailed Des |
0.094 |
  |
  |
.094    |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R289
|
1758.14 |
Br.Replace |
2010-15 |
|
CR 114 Over Powamppokonk Creek: Bridge Replacement
BIN 3304080
NYSDOT moved D, added to R & moved $12K from D to P
|
Schaghticoke (T), County |
|
STP-Off |
0.983 |
|
.122 P |
.004 R |
.726 C |
|
|
|
STP-Off |
|
|
.009 I  |
.122 D |
|
|
|
|
Total |
0.983 |
  |
.131    |
.126    |
.726    |
  |
  |
  |
Prelim. Des. |
0.122 |
  |
.122    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.004 |
  |
  |
.004    |
  |
  |
  |
  |
Construct'n |
0.726 |
  |
  |
  |
.726    |
  |
  |
  |
ROW Incid. |
0.009 |
  |
.009    |
  |
  |
  |
  |
  |
Detailed Des |
0.122 |
  |
  |
.122    |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R292
|
1758.38 |
Reconst'n |
2010-15 |
|
US 4, Couse Corners to Mannix Road: Corridor Improvements
More information is in the 2013-18 TIP project listing.
|
East Greenbush, State, Ln-Mi |
|
STP-Flex |
  |
|
|
|
|
|
|
5.940 C |
STP-Flex |
|
|
|
|
|
|
|
.350 D |
STP-Flex |
|
|
|
|
|
|
|
.050 R |
STP-Flex |
|
|
|
|
|
|
|
.400 P |
Total |
  |
  |
  |
  |
  |
  |
  |
6.740    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
5.940    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.350    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.050    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.400    |
|
Agency: Town
Func. Class:
Plan Ref.: HWY Cond
No EIS Required
AQ Status: Exempt
|
|
|
R295
|
1759.15 |
Safety |
2010-15 |
|
21st Street Realignment & Hoosick Street/Burdett Avenue Intersection
More information is in the 2013-18 TIP project listing.
|
Troy, City |
|
Safety |
  |
|
|
|
|
|
|
1.015 C |
Safety |
|
|
|
|
|
|
|
.140 P |
Safety |
|
|
|
|
|
|
|
.140 D |
Safety |
|
|
|
|
|
|
|
.075 R |
Total |
  |
  |
  |
  |
  |
  |
  |
1.370    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
1.015    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.140    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.140    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.075    |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R296
|
1758.93 |
Bridge R/R |
2010-15 |
|
East Road (CR 33) over Kinderhook Creek: Element Specific Bridge Repair
Bin: 3303760
Construction and ROW were funded from RG126.
|
Stephentown, County |
|
STP-Off |
  |
|
|
|
|
|
|
.550 C |
STP-Off |
|
|
|
|
|
|
|
.075 P |
STP-Off |
|
|
|
|
|
|
|
.075 D |
STP-Off |
|
|
|
|
|
|
|
.021 R |
Total |
  |
  |
  |
  |
  |
  |
  |
.721    |
Construct'n |
  |
  |
  |
  |
  |
  |
  |
.550    |
Prelim. Des. |
  |
  |
  |
  |
  |
  |
  |
.075    |
Detailed Des |
  |
  |
  |
  |
  |
  |
  |
.075    |
ROW Aquis'n |
  |
  |
  |
  |
  |
  |
  |
.021    |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R297
|
1758.98 |
Br.Replace |
2010-15 |
|
Plank Road (CR 128) over the Deepkill: Bridge Replacement
Bin: 3303510
Construction was funded from RG126. NYSDOT added 245K to C.
|
Pittstown, County |
|
STP-Off |
0.928 |
|
|
.928 C |
|
|
|
|
Total |
0.928 |
  |
  |
.928    |
  |
  |
  |
  |
Construct'n |
0.928 |
  |
  |
.928    |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R298
|
1758.99 |
Bridge R/R |
2010-15 |
|
Preservation of County Bridges
CR 26 over Black Creek (3303840), Black River Road over Black River (2202090), Dunham Hollow Road over Tsasawassa Creek (3303870), Dunham Hollow Road over Tsasawassa Creek (3303880)
Murdock Road over Tsasawassa Creek (2201870) is now funded in R322.
The entire 20% match is State funds.
This project was funded from RG126.
|
Multiple, County |
|
STP-Off |
1.660 |
|
|
1.660 C |
|
|
|
|
State |
0.194 |
|
.117 P |
|
|
|
|
|
State |
|
|
.077 D |
|
|
|
|
|
Total |
1.854 |
  |
.194    |
1.660    |
  |
  |
  |
  |
Construct'n |
1.660 |
  |
  |
1.660    |
  |
  |
  |
  |
Prelim. Des. |
0.117 |
  |
.117    |
  |
  |
  |
  |
  |
Detailed Des |
0.077 |
  |
.077    |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R302
|
1759.82 |
Resurface |
2013-18 |
|
Burden Lake Road (CR 51) from NY 43 to First Dyke Road: Resurfacing
Includes sharrows.
County will do all design and construction supervision and be reimbursed for the latter at 6% of construction cost.
This project was funded as a drawdown on RG125.
|
Sand Lake, County, 1.72 clm |
|
STP-Urb. |
  |
.452 C |
|
|
|
|
|
|
Total |
  |
.452    |
  |
  |
  |
  |
  |
  |
Construct'n |
  |
.452    |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R308
|
1306.81 |
Bridge R/R |
2016-21 |
|
NY 7 Bridges: Element Specific Repairs
Included Bridges on NY 7 are: Over the Hudson River (1070869) Crossing Elm Street (1072469) Crossing D & H RR (1072479) Crossing NY 32 (1072489)
BIN 1070869 includes 6 ramps.
The other half of this project is A580. C advanced one year
|
Troy, State |
|
Urban-NY |
9.750 |
|
.175 P |
.075 D |
|
|
|
|
Urban-NY |
|
|
|
9.500 C |
|
|
|
|
Total |
9.750 |
  |
.175    |
9.575    |
  |
  |
  |
  |
Prelim. Des. |
0.175 |
  |
.175    |
  |
  |
  |
  |
  |
Detailed Des |
0.075 |
  |
  |
.075    |
  |
  |
  |
  |
Construct'n |
9.500 |
  |
  |
9.500    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UI
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R309
|
1043.58 |
Bike/Ped |
2016-21 |
|
US 9 and 20 Sidewalk Construction from Bruen Court to the Rensselaer City Line
P has been delayed one year.
I & R and additional funds for P & D were added by DOT.
|
East Greenbush, State, 1940 ft |
|
STP-Urb. |
0.790 |
|
|
|
.077 D |
.607 C |
|
|
STP-Urb. |
|
|
|
|
.078 P |
|
|
|
STP-Urb. |
|
|
|
|
.009 I  |
.019 R |
|
|
Total |
0.790 |
  |
  |
  |
.164    |
.626    |
  |
  |
Detailed Des |
0.077 |
  |
  |
  |
.077    |
  |
  |
  |
Construct'n |
0.607 |
  |
  |
  |
  |
.607    |
  |
  |
Prelim. Des. |
0.078 |
  |
  |
  |
.078    |
  |
  |
  |
ROW Incid. |
0.009 |
  |
  |
  |
.009    |
  |
  |
  |
ROW Aquis'n |
0.019 |
  |
  |
  |
  |
.019    |
  |
  |
|
Agency: Town
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R310
|
1760.34 |
Bike/Ped |
2016-21 |
|
Sand Lake Hamlets Sidewalk Enhancements
Rehabilitate 2200 feet of sidewalk & replace 43 pieces of sidewalk in West Sand Lake
Shared jurisdiction: Sand Lake & Rensselaer County
|
Sand Lake, Multiple, 5300 ft |
|
STP-Urb. |
0.739 |
|
|
|
.045 P |
.649 C |
|
|
STP-Urb. |
|
|
|
|
.045 D |
|
|
|
Total |
0.739 |
  |
  |
  |
.090    |
.649    |
  |
  |
Prelim. Des. |
0.045 |
  |
  |
  |
.045    |
  |
  |
  |
Construct'n |
0.649 |
  |
  |
  |
  |
.649    |
  |
  |
Detailed Des |
0.045 |
  |
  |
  |
.045    |
  |
  |
  |
|
Agency: Town
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
CR 18 & CR 51: 1.5 inch Hot Mix Overlay
CR 18 (Hoags Corner Road): from CR 15/51 to CR 20 (Totem Lodge Road)
CR 51 (Burden Lake Road): from CR 18 to CR 52 and First Dyke Road
Parts of CR 51 are in Sand Lake & Nassau
This project was funded from RG138. Includes former R319.
The sponsor is performing P & D phases. Reimbursement is capped as shown below.
|
Nassau (T), County, 2.55 cl-mi |
|
STP-Flex |
0.451 |
|
.006 P |
|
|
|
|
|
STP-Flex |
|
|
.006 D |
|
|
|
|
|
STP-Flex |
|
|
.439 C |
|
|
|
|
|
Total |
0.451 |
  |
.451    |
  |
  |
  |
  |
  |
Prelim. Des. |
0.006 |
  |
.006    |
  |
  |
  |
  |
  |
Detailed Des |
0.006 |
  |
.006    |
  |
  |
  |
  |
  |
Construct'n |
0.439 |
  |
.439    |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UmC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R312
|
1760.48 |
BridgeMisc |
2016-21 |
|
CR 68 (Snyder's Lake Road) Large Culvert Replacement with a Precast Box Culvert
Located between NY 150 and BIN 3303610 (CR 68 over the Wynantskill)
This project was funded from RG138.
Now part of R287.
|
North Greenbush, County |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R313 |
1001.32 |
Br.Replace |
2016-21 |
|
NY 2 over NY 22 Bridge: Replacement
BIN 1000250
|
Petersburgh, State |
|
NHPP |
2.791 |
|
|
|
.135 P |
.135 D |
2.521 C |
|
Total |
2.791 |
  |
  |
  |
.135    |
.135    |
2.521    |
  |
Prelim. Des. |
0.135 |
  |
  |
  |
.135    |
  |
  |
  |
Detailed Des |
0.135 |
  |
  |
  |
  |
.135    |
  |
  |
Construct'n |
2.521 |
  |
  |
  |
  |
  |
2.521    |
  |
|
Agency: NYSDOT
Func. Class: RmA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R314
|
1760.49 |
BridgeMisc |
2016-21 |
|
CR 129 (Tamarac Road): Replace Large Culvert with an Aluminum Box Culvert
Located between NY 7 and Storm Hill Rd.
This project was funded from RG138. NYSDOT changed P & D (increase of $14K)
|
Pittstown, County |
|
STP-Flex |
0.627 |
|
|
.068 P |
|
.513 C |
|
|
STP-Flex |
|
|
|
.046 D |
|
|
|
|
Total |
0.627 |
  |
  |
.114    |
  |
.513    |
  |
  |
Prelim. Des. |
0.068 |
  |
  |
.068    |
  |
  |
  |
  |
Construct'n |
0.513 |
  |
  |
  |
  |
.513    |
  |
  |
Detailed Des |
0.046 |
  |
  |
.046    |
  |
  |
  |
  |
|
Agency: County
Func. Class: RMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R315 |
1043.57 |
Br.Replace |
2016-21 |
|
US 9 Bridge over I-90 (Exit 11): Replacement
BIN 1092730
|
Schodack, State |
|
NHPP |
10.917 |
|
|
|
|
.500 D |
9.917 C |
|
NHPP |
|
|
|
|
|
.500 P |
|
|
Total |
10.917 |
  |
  |
  |
  |
1.000    |
9.917    |
  |
Detailed Des |
0.500 |
  |
  |
  |
  |
.500    |
  |
  |
Construct'n |
9.917 |
  |
  |
  |
  |
  |
9.917    |
  |
Prelim. Des. |
0.500 |
  |
  |
  |
  |
.500    |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R316
|
1001.36 |
Br.Replace |
2016-21 |
|
NY 2 Bridge over the Poestenkill: Replacement
BIN 1000190
|
Brunswick, State |
|
NHPP |
4.108 |
|
.200 P |
.200 D |
|
3.658 C |
|
|
NHPP |
|
|
|
.010 I  |
.040 R |
|
|
|
Total |
4.108 |
  |
.200    |
.210    |
.040    |
3.658    |
  |
  |
Prelim. Des. |
0.200 |
  |
.200    |
  |
  |
  |
  |
  |
Detailed Des |
0.200 |
  |
  |
.200    |
  |
  |
  |
  |
Construct'n |
3.658 |
  |
  |
  |
  |
3.658    |
  |
  |
ROW Incid. |
0.010 |
  |
  |
.010    |
  |
  |
  |
  |
ROW Aquis'n |
0.040 |
  |
  |
  |
.040    |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: UPA
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
NY 2 Slope Repair at the intersection with Stewart Rd.
DOT deferred C one year, then moved back.
|
Petersburgh, State, 2000 ft |
|
STP-Flex |
1.725 |
|
|
1.425 C |
|
|
|
|
STP-Flex |
|
.200 P |
|
.100 D |
|
|
|
|
STP-Flex |
|
|
.030 I  |
.170 R |
|
|
|
|
Total |
1.725 |
.200    |
.030    |
1.695    |
  |
  |
  |
  |
Construct'n |
1.425 |
  |
  |
1.425    |
  |
  |
  |
  |
Prelim. Des. |
  |
.200    |
  |
  |
  |
  |
  |
  |
Detailed Des |
0.100 |
  |
  |
.100    |
  |
  |
  |
  |
ROW Incid. |
0.030 |
  |
.030    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.170 |
  |
  |
.170    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R318
|
1760.36 |
Reconst'n |
2016-21 |
|
East Street from Partition St. to Third Ave.: Reconstruction
Improvements to pavement, and pedestrian accommodations.
Local funds will provide storm water, and sanitary sewer separation and utilities.
C phase was advanced by NYSDOT then delayed. Budget estimates were also changed.
|
Rensselaer, City, .61 cl-mi |
|
STP-Urb. |
2.251 |
|
.200 P |
|
1.851 C |
|
|
|
STP-Urb. |
|
|
.200 D |
|
|
|
|
|
Total |
2.251 |
  |
.400    |
  |
1.851    |
  |
  |
  |
Prelim. Des. |
0.200 |
  |
.200    |
  |
  |
  |
  |
  |
Construct'n |
1.851 |
  |
  |
  |
1.851    |
  |
  |
  |
Detailed Des |
0.200 |
  |
.200    |
  |
  |
  |
  |
  |
|
Agency: City
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
|
CR 51 (Burden Lake Road) from CR 18 to CR 52 and First Dyke Road: 1.5 inch Hot Mix Overlay
This project was funded from RG138. Combined with R311.
|
Multiple, County, 2.15 cl-mi |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: County
Func. Class: UMC
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R320
|
1089.75 |
Traff Op'n |
2016-21 |
|
NY 4 from the Troy City Line to NY 43: Highway, Intersection, ADA, Bike/Ped and Streetscape Improvements
NY547, PROGRAM CODE RPS9 & NY060, PROGRAM CODE RPS0
Some funding was moved between phases & some phases were advanced, then deferred.
This project includes R321.
|
North Greenbush, Town |
|
Demo. |
9.829 |
|
.285 P |
|
.300 P |
|
|
|
Demo. |
|
|
.038 I  |
|
.028 I  |
|
|
|
Demo. |
|
|
|
|
.500 R |
|
|
|
Demo. |
|
|
|
|
.343 D |
|
|
|
Demo. |
|
|
|
|
8.335 C |
|
|
|
Total |
9.829 |
  |
.323    |
  |
9.506    |
  |
  |
  |
Prelim. Des. |
0.585 |
  |
.285    |
  |
.300    |
  |
  |
  |
ROW Incid. |
0.066 |
  |
.038    |
  |
.028    |
  |
  |
  |
ROW Aquis'n |
0.500 |
  |
  |
  |
.500    |
  |
  |
  |
Detailed Des |
0.343 |
  |
  |
  |
.343    |
  |
  |
  |
Construct'n |
8.335 |
  |
  |
  |
8.335    |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R321
|
1089.76 |
Traff Op'n |
2016-21 |
|
NY 4 & Bloomingrove Drive: Intersection Improvements
NY 4 From NY 43 to Sunset Road
NY547, PROGRAM CODE RPS9 Some funding was moved between phases & some phases were advanced.
This project is now included in R320.
|
North Greenbush, Town |
|
Total |
  |
  |
  |
  |
  |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R322
|
1760.69 |
Br.Replace |
2016-21 |
|
Murdock Road Bridge over the Tsatsawassa Creek: Bridge Replacement
BIN 2201870
Capped at the dollar amounts shown. The 20% local match is 5% local and 15% toll credits.
DOT moved D to 16-17 & moved funds from P & D to I & C.
|
Nassau (T), County |
|
STPOffNY |
1.150 |
|
.083 P |
|
.952 C |
|
|
|
STPOffNY |
|
|
.070 D |
|
|
|
|
|
STPOffNY |
|
|
.030 I  |
|
.015 R |
|
|
|
Total |
1.150 |
  |
.183    |
  |
.967    |
  |
  |
  |
Prelim. Des. |
0.083 |
  |
.083    |
  |
  |
  |
  |
  |
Construct'n |
0.952 |
  |
  |
  |
.952    |
  |
  |
  |
Detailed Des |
0.070 |
  |
.070    |
  |
  |
  |
  |
  |
ROW Incid. |
0.030 |
  |
.030    |
  |
  |
  |
  |
  |
ROW Aquis'n |
0.015 |
  |
  |
  |
.015    |
  |
  |
  |
|
Agency: County
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R323
|
1760.84 |
Bike/Ped |
2016-21 |
|
Rensselaer Riverfront Multi-Use Trail
This project constructs 3750 feet of multi-use trail and 100 feet of bike/ped accomodations between DeLaet's Landing and Riverfront Park.
These funds are capped. Funds were rescheduled and moved between non-C phases.
|
Rensselaer, City, 4750 feet |
|
TAP |
1.600 |
|
|
|
.023 R |
1.400 C |
|
|
TAP |
|
|
|
|
.017 I  |
|
|
|
TAP |
|
|
|
|
.038 D |
|
|
|
TAP |
|
|
|
|
.122 P |
|
|
|
Total |
1.600 |
  |
  |
  |
.200    |
1.400    |
  |
  |
ROW Aquis'n |
0.023 |
  |
  |
  |
.023    |
  |
  |
  |
Construct'n |
1.400 |
  |
  |
  |
  |
1.400    |
  |
  |
ROW Incid. |
0.017 |
  |
  |
  |
.017    |
  |
  |
  |
Detailed Des |
0.038 |
  |
  |
  |
.038    |
  |
  |
  |
Prelim. Des. |
0.122 |
  |
  |
  |
.122    |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R324
|
1933.49 |
Safety |
2016-21 |
|
Howland Avenue (formerly Depot Hill Road): Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
DOT deferred P one year.
|
Schaghticoke (T), Town |
|
Rail |
0.330 |
|
|
.025 P |
|
.305 C |
|
|
Total |
0.330 |
  |
  |
.025    |
  |
.305    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.305 |
  |
  |
  |
  |
.305    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R325
|
1933.50 |
Safety |
2016-21 |
|
Old Schaghticoke Road: Grade Crossing Signal Upgrade
Installation of Automatic Gates, Flashing Lights and Pavement Repair
DOT deferred P one year.
|
Schaghticoke (T), Town |
|
Rail |
0.650 |
|
|
.025 P |
|
.625 C |
|
|
Total |
0.650 |
  |
  |
.025    |
  |
.625    |
  |
  |
Prelim. Des. |
0.025 |
  |
  |
.025    |
  |
  |
  |
  |
Construct'n |
0.625 |
  |
  |
  |
  |
.625    |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R326
|
1760.87 |
Bike/Ped |
2016-21 |
|
Hoosic River Greenway Trail Enhancement
First phase of a proposed 2.2-mile trail Includes a 700-foot trail extension from the current terminus to Sewer Plant Road, installation of a 5-car trailhead parking lot, and trailhead amenities
This is a Recreational Trails project
|
Hoosick Falls, Town, 700 Ft |
|
FA |
0.135 |
|
|
.015 P |
.105 C |
|
|
|
FA |
|
|
|
.015 D |
|
|
|
|
Total |
0.135 |
  |
  |
.030    |
.105    |
  |
  |
  |
Prelim. Des. |
0.015 |
  |
  |
.015    |
  |
  |
  |
  |
Construct'n |
0.105 |
  |
  |
  |
.105    |
  |
  |
  |
Detailed Des |
0.015 |
  |
  |
.015    |
  |
  |
  |
  |
|
Agency: NYSDOT
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R327
|
1760.94 |
Safety |
2016-21 |
|
City of Rensselaer PSAP
Pedestrian safety improvements at 6 signalized intersections
This project is capped. NYSDOT advanced P & D 1 year.
|
Rensselaer, City |
|
Safe-100 |
0.500 |
|
|
|
.025 P |
|
.450 C |
|
Safe-100 |
|
|
|
|
.025 D |
|
|
|
Total |
0.500 |
  |
  |
  |
.050    |
  |
.450    |
  |
Prelim. Des. |
0.025 |
  |
  |
  |
.025    |
  |
  |
  |
Construct'n |
0.450 |
  |
  |
  |
  |
  |
.450    |
  |
Detailed Des |
0.025 |
  |
  |
  |
.025    |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R328 |
1761.19 |
Bridge R/R |
2016-21 |
|
Campbell Avenue over Wynantskill: Bridge Repair or Replace
BIN 2202290
|
Troy, City |
|
NHPP-NY |
3.777 |
|
|
|
.325 D |
3.127 C |
|
|
NHPP-NY |
|
|
|
|
.325 P |
|
|
|
Total |
3.777 |
  |
  |
  |
.650    |
3.127    |
  |
  |
Detailed Des |
0.325 |
  |
  |
  |
.325    |
  |
  |
  |
Construct'n |
3.127 |
  |
  |
  |
  |
3.127    |
  |
  |
Prelim. Des. |
0.325 |
  |
  |
  |
.325    |
  |
  |
  |
|
Agency: City
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R329
|
1761.24 |
Bridge R/R |
2016-21 |
|
Stop 13 Rd over Wynantskill: Bridge Repair or Replace
BIN 2201960
|
Sand Lake, Town |
|
STPOffNY |
1.251 |
|
|
|
.100 D |
1.026 C |
|
|
STPOffNY |
|
|
|
|
.100 P |
|
|
|
STPOffNY |
|
|
|
|
.025 I  |
|
|
|
Total |
1.251 |
  |
  |
  |
.225    |
1.026    |
  |
  |
Detailed Des |
0.100 |
  |
  |
  |
.100    |
  |
  |
  |
Construct'n |
1.026 |
  |
  |
  |
  |
1.026    |
  |
  |
Prelim. Des. |
0.100 |
  |
  |
  |
.100    |
  |
  |
  |
ROW Incid. |
0.025 |
  |
  |
  |
.025    |
  |
  |
  |
|
Agency: Town
Func. Class:
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|
R345
|
1761.83 |
Bike/Ped |
2016-21 |
|
Rensselear Bicycle & Pedestrians Access Improvements
1.8 mile paved, off-road trail through 'The Hollow', 0.81 miles of on-road sharrows & signage, & pedestrian crossing improvements at five intersections.
|
Rensselaer, City, 2.6 mi |
|
TAP |
3.070 |
|
|
|
.155 P |
|
2.760 C |
|
TAP |
|
|
|
|
.155 D |
|
|
|
Total |
3.070 |
  |
  |
  |
.310    |
  |
2.760    |
  |
Prelim. Des. |
0.155 |
  |
  |
  |
.155    |
  |
  |
  |
Construct'n |
2.760 |
  |
  |
  |
  |
  |
2.760    |
  |
Detailed Des |
0.155 |
  |
  |
  |
.155    |
  |
  |
  |
|
Agency: City
Func. Class: Mult
Plan Ref.: NV
No EIS Required
AQ Status: Exempt
|
|
|